Title: CAUSES OF HIGH COSTS OF CONSTRUCTION IN NIGERIA
Authors: Aniekwu, Nathaniel, Anny
Okpala, Daniel. C.
Issue Date: 1988
Publisher: Journal of Engineering and Management (ASCE)
Series/Report no.: 114;2
Abstract: Abstract: This paper concerns an investigation into the causes of high costs of construction in Nigeria. A preliminary survey involving all the professionals in the construction industry identified delays and direct cost overruns of the project as the principal factors leading to the high cost of construction. a questionnaire was then designed incorporating factors causing delays and cost overruns, it was distributed to engineers, architects, quantity surveyors, contractors and others involved in construction. a method of analysis was formulated and carried out based on the profession of the respondents and on the role of the individual in the industry (i.e. client, consultant, and contractors) and on the nature3 of construction (civil works and building works). Results indicate that1) high costs con be minimized by minimizing lapses in the management of human and material resources; 2 despite some slight differences, the professionals generally agreed that shortage of materials, methods of financing and payments for completed works, and poor contract management are the three major reasons for high construction costs; and (3) price fluctuation was identified as the most important factor responsible for the escalation of project costs.
URI: http://hdl.handle.net/123456789/215
Appears in Collections:Abstracts

Files in This Item:
File Description SizeFormat 
CAUSES OF HIGH COSTS OF CONSTRUCTION IN NIGERIA.pdf66.75 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.